TC Promenada
External and internal signage, with illuminated façade markings, suspended directional signs…
Cities
In Novi Sad we delivered the signage for Promenada. Projects in Vojvodina are planned around an agreed site visit and installation schedule.
Promenada was a job where a signage system is tested by footfall, not by drawings. A shopping centre of that size has several entrances, a multi-level garage and a tenant list that changes throughout the year — and all of it has to work for a first-time visitor who asks nobody.
Buildings in Novi Sad and the surrounding area are handled by the same team that works in Belgrade, with site visits and installation in agreed slots. On larger projects that means survey, shop drawings and installation are run from one place, so responsibility is not split between subcontractors.
We come out to survey and measure; for buildings outside Belgrade the slot is agreed in advance.
Totems, directories, tenant boards and level-by-level wayfinding.
Entrance signs, floor systems, apartment and common-area marking.
Levels, routes, car-finding points and escape marking.
Contractors are selected according to technique and material, with detailed production drawings and continuous supervision.
The same scope for buildings in Subotica, Zrenjanin, Sombor and the rest of the province.
External and internal signage, with illuminated façade markings, suspended directional signs…
The timing and terms depend on the scope, location and available documentation. Where practical, the first review is based on photographs and dimensions.
The website currently presents Promenada as the Novi Sad reference. Other projects are in Belgrade and elsewhere in the country — the full list is on the projects page.
The CDA team manages installation according to the production drawings and agreed plan. Contractors are selected for the technique, material and site conditions, under our supervision.
The first sign a visitor sees is the one from the street. We design and deliver external…
Inside, a decision is made every few steps. We build a sign system that takes a visitor from…
Where content changes more often than boards can be replaced, the sign becomes a screen. We…
Tell us the building type, its size and the stage it is at. These details help us prepare a more specific response.